# CURRENT-STATE  (standing orient-fast file)

Purpose: one place a new session (planning chat OR Claude Code) reads FIRST to orient
without re-deriving. Keep it SHORT + current. Update the changed lines at the end of a
session; do not let it grow into a log (that's awareness-backlog.md).

Last updated: 2026-07-15 (pm4 -- RE-VERIFIED: consolidation COMPLETE incl. Lane 1+6; B3 resolved =
personal/system-overview/ canonical; advisory #3 dashboard is the next build. If a prior fetch showed
Lane 1/6 as DEFERRED, that was a STALE CACHE -- git+origin have been correct since commit b19b547.)
Canonical surfaces: backlog board = /personal/backlog-board/ | week = /personal/this-week/
| full history = awareness-backlog.md | hub health = /personal/hub-health-2026-07-07/
Session routine + automation scripts: HUB-SWEEP.md (run hub-sweep.js at start, hub-validate.js before commit).
Session resilience: handoff-blocks/RESUME.md (crash checkpoint -- read FIRST at session start).
Prompt handoff: prompts/NEXT.md (planning chat's next prompt; Sam says "run NEXT" -- human-triggered).

## >>> YOUR MOVES (reprioritized 2026-07-10) <<<

### READY-TO-DO (CC-prepped -- your step is small; top 5)
1. FRIDGE: measure the opening after cabinets are out + run the water line + level (page has the checklist).
2. GM INTERVIEW PREP: review /personal/ai-hub/career/gm-interview-prep-2026.html + FILL the 5 STAR slots (with Claude) -- validation root-cause, led-project, DFSS/DFMEA catch, data/AI win, cross-functional.
3. PETER: fill the 2 timing blanks on the proposal + SEND it (opens a paying job). /customer-jobs/peter-scott-shed-2026-05/proposal.html.
4. GRILL: 4 photos + 2 measures + 3 classifications (bracket interface / rail shape / fence) on the grill page -> CC picks the exact mount.
5. ROBO: if no reply from Robo by EOD 7/14, email DOM directly 7/15 (John already messaging them). Brief current on company-research.html.

### Full list by priority

TODAY / HIGH
1. FINISH the fridge install -- Bosch B36CT81ENS PURCHASED 7/8 + INSTALLED IN PLACE (Sam got it in
   via dolly). Remaining: pull the 2 upper cabinets to clear it, MEASURE the opening (>=36in W + 72in H
   + ~1in airflow), run a WATER LINE, LEVEL it. If it rode lying down, stand upright ~24h before
   power-on. Old Whirlpool -> garage (defrost parts ready). Specs + install: /personal/refrigerator-buying-2026/.

CAREER (Sam-driven)
2. Email DOM re next step / David DiMeo meeting timing -- Sam sending. (Dom already wants you.)
3. Message LUKE + ADAM re the 2 GM reqs + other openings, when you get a beat.

MEDIUM (staged + ready; do on your signal / a set time block)
4. GM INTERVIEW PREP -- review + pick 3-4 real STAR stories. Ready:
   /personal/ai-hub/career/gm-interview-prep-2026.html.
5. PETER shed proposal -- fully staged; fill the 2 timing blanks + SEND. Needs a ~10-min block you set.

LOWER / AS-CAPACITY
6. FRIDGE garage-unit defrost fix A/B/C -- parts one-click ready (thermostat WPW10392132 + heater on
   the fridge page). Not urgent now that the Bosch is the primary.
7. 5-min captures: GRILL (4 photos + 2 measures) -> CC finishes the mount; KITCHEN opening (WxHxD +
   doorway); PITTSBURGH 2 trip photos (or say "remove").
8. BOATS (Mercury 90 battery, jet ski start, bunk carpet); LAZAR bathroom (framing/plumbing + shower
   kit, then invoice); Catherine Howe Thu 7/9 11am; Progressive; CeCe/Medicaid; car registrations.

NOT A PRIORITY (per Sam 2026-07-08)
- INVOICES (Letvin $695 / Talmid ~$813) -- de-prioritized; Sam has settled/collected or will update
  their status later. Scripts stay staged at /personal/ar-collections-2026-07/ (unlinked, direct URL) if needed.

## Active threads (status -> next action -> priority)

| Thread | Status (2026-07-08) | Next action | Priority |
|---|---|---|---|
| Fridge replacement (Bosch B36CT81ENS) | PURCHASED 7/8 + IN PLACE (via dolly) | Finish: pull cabinets, measure opening, water line, level, upright 24h | TODAY/HIGH |
| Robo (Dom) | 7/14: John will message Robo, Sam "doesn't need to worry" | If no reply by EOD 7/14 -> Sam emails Dom directly 7/15 | HIGH (Sam) |
| GM apps + interview | TS role (JR-202611969) FILLED 7/14; SSLE (JR-202612558) pending; prep doc built + STAR slots | Fill STAR slots; apply to a few more GM/related (not urgent) | MEDIUM |
| Pump-sink fish table | NEW 7/14: barb-to-3/4-GHT adapter fix documented | Measure pump outlet hose ID -> CC confirms exact adapter | LOWER (Sam) |
| Peter Scott shed | Send-ready; only 2 timing blanks left | Fill timing + SEND | MEDIUM |
| Fridge (WRT311FZDW01 garage unit) | DEFROST failure; parts prepped one-click | Decide A/B/C later | LOWER |
| DDR grill | Regulator ordered; 5-min capture box on page | Do the photos+measures | LOWER |
| Kitchen layout | No plan doc yet; needs opening measure | Measure opening (WxHxD) + doorway | LOWER |
| Lazar bathroom | Customer live in /manage; framing largely done | Finish framing/plumbing + shower kit, invoice | PHYSICAL |
| Invoices (AR) | Letvin $695 / Talmid ~$813; scripts staged | Sam to update status later | NOT-PRIORITY |
| Website /manage | DEPLOYED (Lazar + bug-a, v1.7.24/sw v60) | Confirm names show in app | done |
| Firebase Stage B | HELD; nothing executed | Run kit after Robo/GM week | HELD |
| Bug-(b) $0 financials | Blob-dependent (6/01 scrub) | localStorage console check | LOWER |
| Mike Letvin Mercury | PARKED (Mike's call) | none | parked |
| Boats / misc | FW items; Mercury 90 battery; jet ski; bunk carpet; XR print | as capacity | LOWER |

## Approvals awaiting Sam (propose-only -- CC will NOT execute without a yes)
- DONE 2026-07-08: sweep-bot ACTIVATED (flag-only, read-only) as a `hub-check` job folded into the
  existing weekly-maintenance.yml. Notifies Sam on a regression; no content writes. Disable = delete
  the job / revert the commit.
1. ULTRACODE CONSOLIDATION -- **COMPLETE 2026-07-15** (all reviewed lanes executed; P0-b excluded/gated).
   DONE + pushed: Lane 2 (guides/ -> equipment/), Lane 3 (governance docs canonical entry + cross-refs),
   Lane 4 partial (20 May audit logs archived; cc-session-reports kept -- live runtime dep), Lane 5
   (substrate sibling pointer), Lane 7 (sitemap accuracy + curation note), **Lane 1 (status-tracker
   RETIRED: ~29 referrers repointed, 28 files archived, canonical + fallback redirects; deploy-log.json
   kept live in place per B1), Lane 6 (B3 RESOLVED -- personal/system-overview/ canonical; internal
   handoff-blocks/architecture/system-overview.* archived; cc-session-reports/latest.md runtime dep
   verified intact).** Archive-not-delete honored; hub-check CLEAN throughout. Only non-archive deletion
   all-consolidation = one empty .gitkeep. Canonical tracker set: CURRENT-STATE.md | /personal/this-week/
   | /personal/backlog-board/ | /personal/system-overview/ (dashboard).
   ONLY REMAINING (still gated): P0-b customer-store consolidation -- Firebase-dependent (see item 5).
2. Firebase Stage B GO/NO-GO -- HELD; recommend AFTER the Robo/GM week settles.
3. ADVISORY #3 (auto status dashboard from CURRENT-STATE) -- **NOW FULLY UNBLOCKED**: source
   (CURRENT-STATE.md) canonical + render target decided (personal/system-overview/ per B3). This is the
   recommended NEXT BUILD. Not built this session (per sequencing). See `architecture/advisory-2026-07-15.md`.
5. Pick ONE canonical customer store (data/customers/ vs /manage) -- sequence WITH Firebase Stage B (P0-b, gated).
(Website deploy: already done 7/7 -- nothing staged now.)

## Notes
- Bypass permission mode ON (deny rules rm/.env still hold). Website = propose-and-pause on prod deploy;
  substrate MAY push. deploy-log.json NEVER touched.
- 2026-07-08 sweep: 17 flagged links = all false positives (Worker routes/templates), planned pages
  (celtics/metal-3dp subdirs), or SAM-photos (pittsburgh). No new safe fixes. ar-collections orphan is
  intentional (sensitive, direct-URL). GM prep + Peter confirmed staged-ready.
